 |
 |
| Pressure Treated plates on Lower
Level Slab |
Waterproofing, gravel, protective
barrier |
 |
 |
| Retaining Wall Steel |
Retaining Wall Steel |
 |
 |
| Power, Water and Cable running into
Mechanical Room |
We build in Winter, too! |
 |
 |
| Conventional Framed subfloor with
Special Engineering |
Starting logs on specially-designed
subfloor |
 |
 |
| Massive 8” x 16” “Timberwright’ Logs
with Through-bolts” |
Main Living Room Area |
 |
 |
| Log Cribs with Through-bolts |
Log Cribs with Conventional Framed
section in between |
 |
 |
| Gable end before plywood |
Finished home from the front |
 |
 |
| Finished home view side |
Round Log Gable Truss for Portico |
 |
 |
| Steel bolts for strength |
Round Log Timber Truss to support
Portico Roof |
 |
 |
| Steel bolts, recessed to be pegged
with wood |
Timber Truss in place for Portico
Support |
 |
 |
| First Batch of Boulders for Posts |
Completed Round Log Portico |
 |
 |
| Round Log Accent for light fixture |
Stair parts being delivered |
 |
 |
| Stair parts being delivered |
5” x 14” oak treads—Massive Timbers |
 |
 |
| Stairs during installation |
Completed Stairs |